| 21. |
The 'centre line method' is specially adopted for estimating
|
||||||||
|
Answer:
Option (d) |
| 22. |
Pick up the incorrect statement from the following
|
||||||||
|
Answer:
Option (d) |
| 23. |
Carpet area does not include the area of (As per IS 3861)
|
||||||||
|
Answer:
Option (d) |
| 24. |
Pick up the correct statement regarding the centre line method of estimating a building
|
||||||||
|
Answer:
Option (d) |
| 25. |
Pick up the correct statement from the following
|
||||||||
|
Answer:
Option (d) |
| 26. |
According to Indian Standards Institution, the actual size of modular bricks is
|
||||||||
|
Answer:
Option (c) |
| 27. |
The unit of measurement is per quintal for the following
|
||||||||
|
Answer:
Option (d) |
| 28. |
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
|
||||||||
|
Answer:
Option (d) |
| 29. |
Pick up the correct statement from the following
|
||||||||
|
Answer:
Option (d) |
| 30. |
The following item of earth work is not measured separately.
|
||||||||
|
Answer:
Option (d) |