Harbour & Airport Engineering (2180602) MCQ

MCQs of Airport Planning

MCQ No - 1

The objectives of the master plan according to FAA are (i) To provide an effective graphical presentation of development of airport (ii) To establish schedule of priorities for proposed plan (iii) To present pertinent back-up information for development of master plan (iv) To describe the various concept and alternatives for proposed plan

(A) (i) and (ii)
(B) (i),(iii) and (iv)
(C) (i) (ii) and (iv)
(D) (i),(ii),(iii) and (iv)

D
MCQ No - 2

Conical surface of the approach area rises outwards

(A) 1 in 10
(B) 1 in 15
(C) 1 in 20
(D) 1 in 245

C
MCQ No - 3

Conical surface of the approach area rises outwards

(A) 1 in 10
(B) 1 in 15
(C) 1 in 20
(D) 1 in 245

C
MCQ No - 4

The meteorological condition which influences the size and location of an air port is

(A) air density
(B) reduced level
(C) wind direction
(D) all the above

D
MCQ No - 5

According to I.C.A.O. the slope of transitional surface at right angles to the centre line of runway, is kept

(A) 1 in 4
(B) 1 in 5
(C) 1 in 6
(D) 1 in 7

D