| 51. |
Enlarging the stem of bore hole at the depth is done by using________
|
||||||
|
Answer:
Option (b) |
| 52. |
In the process of pile foundation, boring is done with the help of _________
|
||||||||
|
Answer:
Option (c) |
| 53. |
Routine tests are usually carried out on _________
|
||||
|
Answer:
Option (b) |
| 54. |
The depth of the bore hole is checked at _________ before insertion of the under-reamer.
|
||||
|
Answer:
Option (a) |
| 55. |
Which of the following stages are involved in the construction of under reamed piles?
|
||||
|
Answer:
Option (a) |
| 56. |
The equipment required for construction of a under-reamed pile is________
|
||||||||
|
Answer:
Option (d) |
| 57. |
The load-carrying capacity of an under-reamed pile may be determined by _________
|
||||||||
|
Answer:
Option (a) |
| 58. |
Negative skin friction on piles
|
||||||||
|
Answer:
Option (d) |
| 59. |
A 12 m long 300 mm diameter pile is driven in a uniform deposit of sand (∅ = 40°). the water table is at a great depth and not likely to rise. The average dry weight of sand is 18 kN/m3. Using Nq = 135 calculate the safe load capacity of the pile with F. O. S. 2.5.Assume K=2.0,δ = 30°.
|
||||||||
|
Answer:
Option (c) |