Construction Management (2180611) MCQ

MCQs of Construction Quality Management

MCQ No - 1

At a work site, statistical quality control of concrete means

(A) Measurement of risks to eliminate failures
(B) Applying the theory' of probability to sample testing or inspection
(C) Reduction in wastage of inspection costs
(D) Reduction in costs for the removal of defects

B
MCQ No - 2

Definition of Quality is __________.

(A) It is conformation to specification.
(B) It is about meeting the needs of the customer.
(C) It is reduction in variability.
(D) All of the above

D
MCQ No - 3

Which of these is not a definition of Quality?

(A) It is fitness for purpose
(B) It is guarantee for work done
(C) It is customer satisfaction
(D) It is value for money

B
MCQ No - 4

Which are the indicators of good quality in a structure?

(A) Design of building is structurally sound.
(B) Proper materials are selected for proper purpose
(C) Workmanship is excellent
(D) All of the above

D
MCQ No - 5

Which of this is not a good quality indicator in a structure?

(A) Adequate testing is done and results are satisfactory
(B) Construction is supervised by technically qualified person
(C) Expensive method of construction is adopted
(D) Construction team is quality conscious

C