Industrial Engineering (2161907) MCQ

MCQs of Productivity and Work Study

MCQ No - 1

Work study consists of

(A) Effective use of plant and equipment
(B) Effective use of human effort
(C) Evaluation of human work
(D) All of the above

D
MCQ No - 2

Work study examines

(A) method
(B) duration of work
(C) both ‘a’ and ‘b’
(D) None of the above

C
MCQ No - 3

Work study is also recognised as

(A) Time study
(B) Motion study
(C) both ‘a’ and ‘b’
(D) None of the above

C
MCQ No - 4

The correct order of procedure in method study is

(A) Select – Record – Examine – Develop – Define – Install – Maintain
(B) Select – Define – Examine – Develop – Record – Install – Maintain
(C) Select – Record – Develop – Examine – Define – Install – Maintain
(D) Select – Record – Examine – Define – Develop – Install – Maintain

A
MCQ No - 5

The following factor(s) must be considered while selecting the work for method study

(A) Economic considerations
(B) Technical considerations
(C) Human reactions
(D) All of the above

D