| 21. |
CRP takes material requirements from MRP and converts to
|
||||||||
|
Answer:
Option (d) |
| 22. |
Capacity planning is concerned with
|
||||||||
|
Answer:
Option (c) |
| 23. |
CRP stands for:
|
||||||||
|
Answer:
Option (c) |
| 24. |
MRP II stands for:
|
||||||||
|
Answer:
Option (c) |
| 25. |
MRP-II system is called a closed-loop system because it considers
|
||||||||
|
Answer:
Option (b) |
| 26. |
Purchasing and ___________ represent the implementation and control phase of the production planning and control system.
|
||||||||
|
Answer:
Option (d) |
| 27. |
The MRP forms a vital link between sales and production as follows:
|
||||||||
|
Answer:
Option (d) |
| 28. |
PAC stands for:
|
||||||||
|
Answer:
Option (b) |
| 29. |
The MRP forms a vital link between sales and production as follows:
|
||||||||
|
Answer:
Option (d) |
| 30. |
The objectives in developing an MRP include:
|
||||||||
|
Answer:
Option (d) |