Q.
1
Which of the following scale is the largest one?
(A) 1 cm = 5 m
(B) 1 cm = 50 cm
(C) 1:10,000
(D) 1 cm = 5 km
Answer
(A)
1 cm = 5 m
Q.
2
Which of the following instrument is inserted into ground after every chain length?
(A) Peg
(B) Arrow
(C) Ranging rod
(D) Offset rod.
Answer
(B)
Arrow
Q.
3
The value of dip at magnetic pole is____
(A) 0°
(B) 45°
(C) 90°
(D) 30°
Answer
(C)
90°
Q.
4
Concrete preferably used in manufacturing of railway sleepers, bridge girders, electric poles etc. is_______
(A) P.C.C.
(B) R.C.C.
(C) P.S.C.
(D) P.C.
Answer
(C)
P.S.C.
Q.
5
"Give way” sign is a type of _______
(A) Regulatory sign
(B) Warning sign
(C) Informatory sign
(D) None
Answer
(A)
Regulatory sign
Q.
6
Width of foundation for 30 cm thick wall is ___________
(A) 70 cm
(B) 90 cm
(C) 120 cm
(D) None
Answer
(B)
90 cm
Q.
7
A basin of navigable water well protected naturally or artificially from action of wind and wave is________
(A) Reservoir
(B) Harbour
(C) Dock
(D) All the above
Answer
(B)
Harbour
Q.
8
A framework of numbers of connected survey lines is called______
(A) Bearing
(B) Traverse
(C) Contour
(D) Declination.
Answer
(B)
Traverse
Q.
9
Error in reciprocal leveling is not completely eliminated due to_____
(A) Curvature
(B) Refraction
(C) Non-adjustment of line of collimation
(D) Parallax.
Answer
(B)
Refraction
Q.
10
Initial setting time of cement is delay due to presence of ______
(A) CaCO
3
(B) CaO
(C) CaSO
4
(D) Al
2
O
3
Answer
(C)
CaSO
4
Q.
11
Geometric element provided to road surface in transverse direction to drain off rain water from road surface is _________
(A) Shoulder
(B) Super elevation
(C) Camber
(D) All the above
Answer
(C)
Camber
Q.
12
A survey conducted to determine latitudes, longitudes, azimuths etc. for various places on the earth by observing heavenly body is ______
(A) Archeological survey
(B) Aerial survey
(C) Astronomical survey
(D) Geological survey
Answer
(C)
Astronomical survey
Q.
13
A 100 ft long chain is a _______
(A) Gunter’s chain
(B) Revenue chain
(C) Engineer’s chain
(D) Metric chain
Answer
(C)
Engineer’s chain
Q.
14
A hydraulic structure constructed across river to control flood is _____
(A) Check dam
(B) Gravity dam
(C) Coffer dam
(D) All the above
Answer
(B)
Gravity dam