31.
_____________ is/are taken to check the accuracy of triangle which divide traverse in chain surveying.
(a) Tie line
(b) Base line
(c) Check line
(d) None of above
Answer:

Option (c)

32.
_______________ is formed to take interior details which is far from main survey line.
(a) Tie line
(b) Base line
(c) Check line
(d) None of above
Answer:

Option (a)

33.
In chain survey, main station should be selected such that it divides whole area in to ______________ triangles.
(a) Obtuse angled
(b) Right angled
(c) Isosceles
(d) Well conditioned
Answer:

Option (d)

34.
_________________ is one of the way of indirect calculation of distance on the sloping ground.
(a) Pythagoras theorem
(b) Bessel's method
(c) Hypotenusal allowance
(d) None of above
Answer:

Option (c)

35.
We need to ________________ the line, when the length of line exceeds the chain length.
(a) Range
(b) level
(c) chain
(d) None of above
Answer:

Option (a)

36.
When the end stations are not inter visible due to high ground between them, ________________ is used to range the line.
(a) Reciprocal ranging
(b) Direct ranging
(c) Line ranger
(d) None of above
Answer:

Option (a)

37.
How many types of offset/s we take in the field during the survey ?
(a) 2
(b) 3
(c) 5
(d) 4
Answer:

Option (a)

38.
Which instrument/s is/are available for taking offsets ?
(a) Optical square
(b) Indian optical square
(c) Open cross staff
(d) All of above
Answer:

Option (d)

39.
The errors which occurs in same direction and tend to accumulate are termed as _____________errors.
(a) Instrumental
(b) Climatic
(c) Cumulative
(d) Compensating
Answer:

Option (c)

40.
If the chain is too small, then measured length will be _____________ and correction will be _________.
(a) more, negative
(b) less, negative
(c) less, positive
(d) less, negative
Answer:

Option (a)