Basic Civil Engineering (3110004) MCQs

MCQs of Introduction to Surveying & Levelling

Showing 21 to 30 out of 90 Questions
21.
The main objective of surveying is to prepare ___________.
(a) Cross section
(b) Isometric projection
(c) Map
(d) None of above
Answer:

Option (c)

22.
The main principle of Surveying is to work from
(a) Part to the whole
(b) Whole to the part
(c) Lower to higher
(d) Ascending to descending
Answer:

Option (b)

23.
The various methods of measuring distances are ______________.
(a) DDM
(b) ODM
(c) EDM
(d) All of above
Answer:

Option (d)

24.
________________ is a instrument which counts and display the number of paces.
(a) Pedometer
(b) Pasometer
(c) Speedometer
(d) None of above
Answer:

Option (b)

25.
Which is/are instruments are used in chain surveying ?
(a) Chains
(b) Pegs
(c) Ranging rods
(d) All of above
Answer:

Option (d)

26.
The chain having length of 100 feet divided in to 100 links is known as _____________.
(a) Metric chain
(b) Engineer's chain
(c) Revenue chain
(d) All of above
Answer:

Option (b)

27.
Which of the following is shortest of rest of all types of chains ?
(a) Gunter's chain
(b) Metric chain
(c) Revenue chain
(d) Steel band
Answer:

Option (c)

28.
Gunter's chain is also known as _____________.
(a) Standard chain
(b) Surveyor's chain
(c) Ranger's chain
(d) None of above
Answer:

Option (b)

29.
While surveying, ___________is inserted into the ground after every chain length measured on the ground.
(a) Ranging rod
(b) Arrow
(c) Both A and B
(d) None of above
Answer:

Option (b)

30.
Tape which is made from an alloy of nickel and steel is known as ____________.
(a) Steel tape
(b) Brass tape
(c) Invar tape
(d) Fibre glass tape
Answer:

Option (c)

Showing 21 to 30 out of 90 Questions