| 1. |
In case of multi-storeyed buildings, the forms to be removed first are
|
||||||||
|
Answer:
Option (a) |
| 2. |
In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is
|
||||||||
|
Answer:
Option (b) |
| 3. |
The process of keeping concrete moist for a certain period after its finishing, is known as
|
||||||||
|
Answer:
Option (d) |
| 4. |
The form work from the slabs excluding props, can be removed only after
|
||||||||
|
Answer:
Option (b) |
| 5. |
The form work from the sides of beams can be removed only after
|
||||||||
|
Answer:
Option (a) |
| 6. |
The stepped structure provided for lateral support of a structure, is
|
||||||||
|
Answer:
Option (a) |
| 7. |
The mortar in which both cement and lime are used as binding materials, is called
|
||||||||
|
Answer:
Option (c) |
| 8. |
M10 grade of concrete approximates
|
||||||||
|
Answer:
Option (a) |
| 9. |
Permissible compressive strength of M 25 concrete grade is
|
||||||||
|
Answer:
Option (d) |
| 10. |
Curing
|
||||||||
|
Answer:
Option (d) |