21. |
The ceiling height of a building is
|
||||||||
Answer:
Option (b) |
22. |
The service area in a building means the area occupied by
|
||||||||
Answer:
Option (d) |
23. |
The thickness of the mortar bed on which the brick flooring is laid is ________
|
||||||||
Answer:
Option (c) |
24. |
In muram flooring, the thickness of the layer of muram laid over the prepared subgrade is _______
|
||||||||
Answer:
Option (b) |
25. |
How many components are there in cement concrete flooring?
|
||||||||
Answer:
Option (a) |
26. |
The minimum thickness of the granolithic finish, when laid over a hardened surface, is __________
|
||||||||
Answer:
Option (a) |
27. |
The ratio of cement and marble in terrazzo is __________
|
||||||||
Answer:
Option (c) |
28. |
The size of the marble chips used in terrazzo flooring varies from __________
|
||||||||
Answer:
Option (b) |
29. |
Which of the following is used as an alternative to terrazzo flooring when the floor needs to be laid quickly?
|
||||||||
Answer:
Option (c) |
30. |
____________ is the top horizontal part of a frame.
|
||||||||
Answer:
Option (b) |