31. |
For developing a city bus system ______________________________ must be carried out.
|
||||||||
Answer:
Option (d) |
32. |
What contributes to the decline of mass transit usage?
|
||||||||
Answer:
Option (d) |
33. |
The time, in seconds, that is required for a passenger to board or alight from transit vehicle is known as __________________.
|
||||||||
Answer:
Option (c) |
34. |
The number of passenger seats on a transit vehicle is known as ______________________.
|
||||||||
Answer:
Option (b) |
35. |
With respect to Transit Capacity the clearance time should not be less than _____________________ minutes.
|
||||||||
Answer:
Option (b) |
36. |
The total length of the Ahmedabad Metro Rail Project Phase-I is about ___________.
|
||||||||
Answer:
Option (b) |