Urban Transportation Planning (3160608) MCQs

MCQs of Urban Mass Transportation Systems

Showing 31 to 36 out of 36 Questions
31.
For developing a city bus system ______________________________ must be carried out.
(a) Road network inventory survey
(b) Origin & Destination survey
(c) Occupancy survey
(d) All of the above surveys
Answer:

Option (d)

32.
What contributes to the decline of mass transit usage?
(a) Public affluence
(b) Increasing availability of automobiles
(c) A desire for low-density housing
(d) All of the above
Answer:

Option (d)

33.
The time, in seconds, that is required for a passenger to board or alight from transit vehicle is known as __________________.
(a) Clearance time
(b) Dwell time
(c) Passenger service time
(d) None of the above
Answer:

Option (c)

34.
The number of passenger seats on a transit vehicle is known as ______________________.
(a) Person capacity
(b) Seat capacity
(c) Crush capacity
(d) None of the above
Answer:

Option (b)

35.
With respect to Transit Capacity the clearance time should not be less than _____________________ minutes.
(a) 10
(b) 15
(c) 5
(d) 20
Answer:

Option (b)

36.
The total length of the Ahmedabad Metro Rail Project Phase-I is about ___________.
(a) 33.65 Kms
(b) 40.03 Kms
(c) 18.87 Kms
(d) 21.16 Kms
Answer:

Option (b)

Showing 31 to 36 out of 36 Questions