| 31. |
For developing a city bus system ______________________________ must be carried out.
|
||||||||
|
Answer:
Option (d) |
| 32. |
What contributes to the decline of mass transit usage?
|
||||||||
|
Answer:
Option (d) |
| 33. |
The time, in seconds, that is required for a passenger to board or alight from transit vehicle is known as __________________.
|
||||||||
|
Answer:
Option (c) |
| 34. |
The number of passenger seats on a transit vehicle is known as ______________________.
|
||||||||
|
Answer:
Option (b) |
| 35. |
With respect to Transit Capacity the clearance time should not be less than _____________________ minutes.
|
||||||||
|
Answer:
Option (b) |
| 36. |
The total length of the Ahmedabad Metro Rail Project Phase-I is about ___________.
|
||||||||
|
Answer:
Option (b) |