21. |
The pressure exerted by
|
||||||||
Answer:
Option (d) |
22. |
A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is
|
||||||||
Answer:
Option (c) |
23. |
|
|||||||||
Answer:
Option (d) |
24. |
|
|||||||||
Answer:
Option (d) |
25. |
Pick up the correct statement from the following :
|
||||||||
Answer:
Option (d) |
26. |
Cement concrete sewers are only suitable if non-scouring velocity is between
|
||||||||
Answer:
Option (a) |
27. |
The grit chambers of sewage treatment plants, are generally cleaned after
|
||||||||
Answer:
Option (d) |
28. |
|
|||||||||
Answer:
Option (d) |
29. |
In very first stage of decomposition of the organic matter in sewage
|
||||||||
Answer:
Option (a) |
30. |
|
|||||||||
Answer:
Option (d) |