21. |
In which type of contract owner acts as a promoter and deligates a large firm to perform both design and construction ?
|
||||||||
Answer:
Option (b) |
22. |
Concession Period in BOT contract is the period of ________.
|
||||||||
Answer:
Option (c) |
23. |
To award the BOT contract, which conditions are evaluated?
|
||||||||
Answer:
Option (b) |
24. |
Which of the following can act as party to a contract?
|
||||||||
Answer:
Option (d) |
25. |
According to Section 10 of Indian Contract Act, 1872 which of the following conditions needs to be satisfied for making an agreement a legally binding contract?
|
||||||||
Answer:
Option (d) |
26. |
Which of the following condition can make contract legalley invalid?
|
||||||||
Answer:
Option (c) |