| 1. |
Which of this is not an advantage of Material Supply Contract?
|
||||||||
|
Answer:
Option (d) |
| 2. |
When contractor is only supplying materials then such contracts are called as ________
|
||||||||
|
Answer:
Option (c) |
| 3. |
Which of the following is a disadvantage of Labour Contract?
|
||||||||
|
Answer:
Option (d) |
| 4. |
When owner is supplying materials and bidder needs to complete all item through supplying labour then such contracts are known as ________.
|
||||||||
|
Answer:
Option (a) |
| 5. |
When owner of the project only performs duty of promoter and delegates duty of design and construction of project to large consortium or firm then such contract is called as ________.
|
||||||||
|
Answer:
Option (b) |
| 6. |
Which of this is not an advantage of Lump-Sum Contract?
|
||||||||
|
Answer:
Option (a) |
| 7. |
A lump-sum contract is also a type of ________ Contract
|
||||||||
|
Answer:
Option (b) |
| 8. |
In lumpsum contract, If contractor abondones work he or she is liable to ________
|
||||||||
|
Answer:
Option (d) |
| 9. |
In which type of contract measurment of executed items are not required to keep ?
|
||||||||
|
Answer:
Option (b) |
| 10. |
In Percentage Rate contract, bidders can bid their rate at ________ rates indicated in bill of quanities.
|
||||||||
|
Answer:
Option (d) |