1. |
When an offer with certain terms and conditions is given in written form it is call as ________.
|
||||||||
Answer:
Option (a) |
2. |
Depending upon type of contract which of the following is not a type of tender?
|
||||||||
Answer:
Option (c) |
3. |
Based on the level of participation tender can be classifed as ________.
|
||||||||
Answer:
Option (d) |
4. |
Based on the level of participation a tender can not be classified as ________
|
||||||||
Answer:
Option (b) |
5. |
In which type of tender any eligible contractor willing to do work is allowed to bid?
|
||||||||
Answer:
Option (a) |
6. |
Which of the following is a subtype of open tender?
|
||||||||
Answer:
Option (d) |
7. |
In which type of tender architect invites tender on behalf of client?
|
||||||||
Answer:
Option (a) |
8. |
When tender is available to only limited number of contractor to fill up such tender is called as _______.
|
||||||||
Answer:
Option (b) |
9. |
When negotiations are done with only few contractors for the cost of work then such tenders are called as ________
|
||||||||
Answer:
Option (a) |
10. |
Which of the following is not a step of tendering process?
|
||||||||
Answer:
Option (c) |