Traffic Engineering and Management (3160615) MCQs

MCQs of Traffic Forecasting

Showing 1 to 8 out of 8 Questions
1.

The year when all primary traffic surveys are carried out is called __________.

(a)

Base year

(b)

Fundamental year

(c)

Horizon year

(d)

Initial year

Answer:

Option (a)

2.

The difference between the end year of the design period and the base year is called _____________.

(a)

Design period

(b)

Forecast period

(c)

Horizon period 

(d)

Base period

Answer:

Option (b)

3.

The additional traffic volumes likely to occur on project corridor due to road improvements are termed as ______________.

(a)

Normal traffic

(b)

New traffic

(c)

Generated traffic

(d)

Base traffic

Answer:

Option (c)

4.

_____________ is the estimated traffic on a roadway facility due to increase in population, natural change in land-use and normal socio-economic development in the region.

(a)

Diverted traffic

(b)

Induced traffic

(c)

Generated traffic

(d)

Normal traffic

Answer:

Option (d)

5.

Which of the following types of traffic is project specific?

(a)

Generated traffic

(b)

Developmental traffic 

(c)

Both A & B

(d)

Normal traffic

Answer:

Option (c)

6.

____________ is the component of generated traffic.

(a)

Normal traffic

(b)

Developmental traffic 

(c)

Diverted traffic

(d)

None of the above

Answer:

Option (c)

7.

Time series analysis is carried out using ___________.

(a)

Smoothening techniques

(b)

Auto regressive moving average

(c)

Auto integrated moving average

(d)

All of the above

Answer:

Option (d)

8.

It is necessary to use travel behaviour data for the estimation of ______________ traffic

(a)

Diverted

(b)

Induced

(c)

Both A & B

(d)

Normal

Answer:

Option (c)

Showing 1 to 8 out of 8 Questions