1. |
The year when all primary traffic surveys are carried out is called __________.
|
||||||||
Answer:
Option (a) |
2. |
The difference between the end year of the design period and the base year is called _____________.
|
||||||||
Answer:
Option (b) |
3. |
The additional traffic volumes likely to occur on project corridor due to road improvements are termed as ______________.
|
||||||||
Answer:
Option (c) |
4. |
_____________ is the estimated traffic on a roadway facility due to increase in population, natural change in land-use and normal socio-economic development in the region.
|
||||||||
Answer:
Option (d) |
5. |
Which of the following types of traffic is project specific?
|
||||||||
Answer:
Option (c) |
6. |
____________ is the component of generated traffic.
|
||||||||
Answer:
Option (c) |
7. |
Time series analysis is carried out using ___________.
|
||||||||
Answer:
Option (d) |
8. |
It is necessary to use travel behaviour data for the estimation of ______________ traffic
|
||||||||
Answer:
Option (c) |