Construction Equipment and Automation (3160617) MCQs

MCQs of Introduction - Construction Equipment

Showing 21 to 30 out of 37 Questions
21.

________________ is used to excavate the trenches of width from 250 mm to 450 mm and depth 4 m with accuracy and speed.

(a)

Ripper

(b)

Rooter

(c)

Scarifier

(d)

Ditcher

Answer:

Option (d)

22.

____________ type Trencher can dig a trench up to 10 m in depth and 4 m in width.

(a)

Bucket

(b)

Wheel

(c)

Ladder

(d)

Series

Answer:

Option (c)

23.

 ___________________ are used for vertical transportation of aggregates and wet concrete on large project sites.

(a)

Elevators

(b)

Trucks

(c)

Conveyors

(d)

Escalators

Answer:

Option (a)

24.

In order to raise and shift heavy loads from one place to another, the _________ are employed in the construction of big works.

(a)

Elevators

(b)

Conveyors

(c)

Cranes

(d)

Trucks

Answer:

Option (c)

25.

 ________________ crane is used for open sites and it possesses a very long reach.

(a)

Goliath

(b)

Derrick

(c)

Swing jib

(d)

Cable

Answer:

Option (b)

26.

 In _________________ type of crane, heavy temporary staging or platform is prepared for the working of the crane.

(a)

Cableways

(b)

Swing jib

(c)

Goliath

(d)

Platform

Answer:

Option (c)

27.

________________ are cranes of Swing jib type and are mounted on high Steel Towers.

(a)

Cableways

(b)

Swing jib

(c)

Tower

(d)

Goliath

Answer:

Option (c)

28.

Which process comes after batching in manufacture process?

(a)

Transportation

(b)

Placing

(c)

Mixing

(d)

Compacting

Answer:

Option (c)

29.

Ready mix plant and central mix plant differ in:

(a)

Transportation

(b)

Setting time

(c)

Properties

(d)

Water addition

Answer:

Option (d)

30.

How many methods of batching are there?

(a)

2

(b)

3

(c)

5

(d)

6

Answer:

Option (a)

Showing 21 to 30 out of 37 Questions