1.

What can we achieve by automatic equipment in construction?

(a)

Increase productivity

(b)

Increase quality

(c)

Reduce duration

(d)

All of the above

Answer:

Option (d)

2.

What is the work of paddle in automatic canal lining machine?

(a)

Distribute the concrete

(b)

Collect the concrete

(c)

Finishing the concrete

(d)

Vibrating the concrete

Answer:

Option (a)

3.

What is the work of baffles in an automatic canal lining machine?

(a)

Distribute the concrete

(b)

Collect the concrete

(c)

Vibrating the concrete

(d)

Finishing the concrete

Answer:

Option (b)

4.

Which type of tool can be reversed to carry extra concrete back up the slope?

(a)

Paddles

(b)

Baffles

(c)

Spools

(d)

Water stop material

Answer:

Option (a)

5.

What is the use of water stop material in canal lining?

(a)

To stop extra water

(b)

To maintain water in concrete

(c)

Creating the longitudinal fracture joints

(d)

To change canal's slope

Answer:

Option (c)

6.

What is the use of the work bridge/cure machine?

(a)

For finishing the canal

(b)

To apply curing compound

(c)

To gave finishers a platform

(d)

All of the above

Answer:

Option (d)

7.

What is the efficient output of an automatic canal lining machine under ideal conditions?

(a)

10.20 cum/h

(b)

13.20 cum/h

(c)

15.20 cum/h

(d)

17.20 cum/h

Answer:

Option (d)

8.

Why automatic machines should be implemented in construction?

(a)

To improve the quality

(b)

To improve the safety

(c)

To improve the productivity

(d)

All of the above

Answer:

Option (d)

9.

Which type of system gets the required field data for equipment used in road work? 

(a)

GPS-based system

(b)

Laser-based system

(c)

Infrared-based system

Answer:

Option (b)

10.

What is the use of auto-adjustment knob working in the asphalt paver machine?

(a)

To get the required depth of asphalt layer

(b)

To get the required bituminous content on bituminous mix

(c)

To get the required depth of prime coat

Answer:

Option (a)