| 21. |
Which of the following modeling can be done through BIM?
|
||||||||
|
Answer:
Option (d) |
| 22. |
Which of the following is not an element of BIM?
|
||||||||
|
Answer:
Option (b) |
| 23. |
Which of the following is not a fundamental of BIM?
|
||||||||
|
Answer:
Option (d) |
| 24. |
Which of the following is an use of BIM in project life cycle?
|
||||||||
|
Answer:
Option (d) |
| 25. |
Which of the following is not a future potential of BIM?
|
||||||||
|
Answer:
Option (d) |