11. |
The most reliable estiamte is
|
||||||||
Answer:
Option (a) |
12. |
The main factor to be considered while preparing a detailed estimate, is
|
||||||||
Answer:
Option (d) |
13. |
The damp proof course (D.P.C.) is measured in
|
||||||||
Answer:
Option (b) |
14. |
The area is measured correct to the nearest
|
||||||||
Answer:
Option (a) |
15. |
The volume is measured correct to the nearest
|
||||||||
Answer:
Option (b) |
16. |
Pick up the correct statement from the following
|
||||||||
Answer:
Option (d) |
17. |
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
|
||||||||
Answer:
Option (d) |
18. |
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
|
||||||||
Answer:
Option (d) |
19. |
The measurement is not made in square metres in case of
|
||||||||
Answer:
Option (d) |
20. |
According to ISI method of measurement, the order of the sequence is
|
||||||||
Answer:
Option (a) |