Engineering Economics, Estimation and Costing (3170615) MCQs

MCQs of Rate Analysis

Showing 21 to 28 out of 28 Questions
21.

Volume of 1 bag (50kg) of cement is ________ m3

(a)

0.045

(b)

0.055

(c)

0.035

(d)

0.025

Answer:

Option (c)

22.

What will be volume of dry mortart for plaster work, if volume of wet mortar is 10m3?

(a)

15.2m3

(b)

12.5m3

(c)

15m3

(d)

12m3

Answer:

Option (b)

23.

When water is added to dry mix of concrete its volume shrinks by ________ %

(a)

25

(b)

30

(c)

15

(d)

52

Answer:

Option (d)

24.

For 1 : 3 proportion of mortar for plaster work parts of sand will be ________ .

(a)

1 Part

(b)

4 Part

(c)

3 Part

(d)

2 Part

Answer:

Option (c)

25.

For M20 grade of concrete, ______ parts of cement is required.

(a)

1 Part

(b)

2 Part

(c)

3 Part

(d)

1.5 Part

Answer:

Option (a)

26.

For M15 grade of concrete total part of concrete is ________.

(a)

5 Part

(b)

7 Part

(c)

5.5 Part

(d)

4 Part

Answer:

Option (b)

27.

The quantity of cement required for RCC (1:2:4) for 10m3 is ________.

(a)

3136kg

(b)

3115kg

(c)

4120kg

(d)

3127kg

Answer:

Option (d)

28.

The rate of an item of work depends on

(a)

Specifications of works

(b)

Specifications of materials

(c)

Proportion of mortar

(d)

All the above

Answer:

Option (d)