1. |
Rate analysis is a process of deriving rate of unit item from the cost of its _____________
|
||||||||
Answer:
Option (d) |
2. |
Which of the following cost is not included in Rate Analysis of an item _____________
|
||||||||
Answer:
Option (c) |
3. |
Usually contractor’s profit is taken ________ % for rate analysis of an item.
|
||||||||
Answer:
Option (a) |
4. |
Water charges are usually taken as ________ % for rate analysis of an item.
|
||||||||
Answer:
Option (c) |
5. |
Purpose of rate analysis is to ______________
|
||||||||
Answer:
Option (b) |
6. |
To fill the rate of an item in contract, Contractor needs to perform ____________.
|
||||||||
Answer:
Option (c) |
7. |
Which of the following can be prepared using rate analysis?
|
||||||||
Answer:
Option (b) |
8. |
The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as ________.
|
||||||||
Answer:
Option (d) |
9. |
Task work per day means ______ hours per day
|
||||||||
Answer:
Option (b) |
10. |
Which of the following factor affects task work of a labour?
|
||||||||
Answer:
Option (d) |