Engineering Economics, Estimation and Costing (3170615) MCQs

MCQs of Rate Analysis

Showing 11 to 20 out of 28 Questions
11.

Which of the following does not affect task work of a labour?

(a)

Type of material

(b)

Training of a labour

(c)

Labour wages

(d)

Physical condition of labour

Answer:

Option (a)

12.

_____ Belders and ______ Labours are required for 1000cuft of earthwork as per NBO.

(a)

4, 5

(b)

5, 4

(c)

3, 4

(d)

4, 3

Answer:

Option (b)

13.

Standard labour requirement for laying of plain cement concrete per 100 cu ft is______.

(a)

0.5 Mason, 5 Beldar, 3 Labour, 2 Bhisti

(b)

0.25 Mason, 2 Beldar, 3 Labour, 1 Bhisti

(c)

0.25 Mason, 2 Beldar, 3 Labour, 0.75 Bhisti

(d)

0.75 Mason, 3 Beldar, 5 Labour, 0.5 Bhisti

Answer:

Option (c)

14.

What is standard labour requirement for Brickwork of 10cum for first class brick masonry?

(a)

0.5 Mistry, 16 Mason, 8 Mazdoors, 1.5 Bhisti

(b)

0.75 Mistry, 10 Mason, 15 Mazdoors, 1 Bhisti

(c)

1 Mistry, 11 Mason, 14 Mazdoors, 2.5 Bhisti

(d)

0.5 Mistry, 8 Mason, 16 Mazdoors, 2 Bhisti

Answer:

Option (d)

15.

For plastering of 12mm thick and 40 sq. m area ________ Labours are required.

(a)

0.5 Mistry, 3 Mason, 3 Labours, 1 Bhisti

(b)

0.75 Mistry, 10 Mason, 10 Labours, 2 Bhisti

(c)

1 Mistry, 4 Mason, 4 Labours, 0.75 Bhisti

(d)

1.5 Mistry, 5 Mason, 4 Labours, 1.5 Bhisti

Answer:

Option (a)

16.

Standard size of brick is ________.

(a)

20cm×10cm×10cm

(b)

19cm×9cm×9cm

(c)

19cm×19cm×9cm

(d)

20cm×20cm×10cm

Answer:

Option (b)

17.

Equation to find out No of bricks required is ________.

(a)

(Total Volume of Brickwork)/(Standard Size of One Brick)

(b)

(Nominal Size of One Brick)/(Total Volume of Brickwork)

(c)

(Total Volume of Brickwork)/(Nominal Size of One Brick)

(d)

(Total Volume of Brickwork)/(Nominal Size of Masonary work)

Answer:

Option (c)

18.

________ No. of Bricks required for 1m3 of brick masonry.

(a)

550

(b)

600

(c)

650

(d)

500

Answer:

Option (d)

19.

For frog filling & wastage ______ % of mortar is taken as extra in brick masonry work.

(a)

20

(b)

15

(c)

25

(d)

30

Answer:

Option (b)

20.

To convert wet mortar into dry _______% of mortar is taken as extra in brick masonry work.

(a)

25

(b)

15

(c)

30

(d)

20

Answer:

Option (a)

Showing 11 to 20 out of 28 Questions