11. |
A duplicate signal of semaphore signal ( smaller arm) is provided known as____________
|
||||||||
Answer:
Option (a) |
12. |
The name of yard used for sorting of goods wagon to form a new goods trains
|
||||||||
Answer:
Option (a) |
13. |
In a crossing____________ the rail provided exact opposite to the wing rail
|
||||||||
Answer:
Option (b) |
14. |
Which is first stop signal
|
||||||||
Answer:
Option (a) |
15. |
Only for divide long block section, No passengers are booked ,No train normally stops at these stations.
|
||||||||
Answer:
Option (c) |
16. |
As per IR height of the platform at station for BG Track
|
||||||||
Answer:
Option (b) |
17. |
The yard at which defective wagon or coach is kept
|
||||||||
Answer:
Option (b) |
18. |
In Multiple aspect upper quadrant signal the arm position at 0⁰, 45⁰ and 90⁰ indicates
(1) Stop, caution, Proceed
(2) Caution, Stop, Proceed
(3) Proceed, Caution, Stop
(4) All above
|
||||||||
Answer:
Option (a) |
19. |
In color light signal the purpose for Red, Yellow, Double yellow and Green the correct order is
|
||||||||
Answer:
Option (d) |
20. |
It is the LAST STOP SIGNAL at the station
|
||||||||
Answer:
Option (c) |