Railway and Airport Engineering (3170619) MCQs

MCQs of Unit 2 : Layout of Turnout

Showing 11 to 20 out of 28 Questions
11.
A duplicate signal of semaphore signal ( smaller arm) is provided known as____________
(a) Repeater signal
(b) Point indicator
(c) routing signal
(d) co-acting signal
Answer:

Option (a)

12.
The name of yard used for sorting of goods wagon to form a new goods trains
(a) Marshaling yard
(b) coaching yard
(c) locomotive yard
(d) sick line yard
Answer:

Option (a)

13.
In a crossing____________ the rail provided exact opposite to the wing rail
(a) Tongue rail
(b) Check rail
(c) Wing rail
(d) Stock rail
Answer:

Option (b)

14.
Which is first stop signal
(a) Home Signal
(b) Starter Signal
(c) Warner signal
(d) None of the above
Answer:

Option (a)

15.
Only for divide long block section, No passengers are booked ,No train normally stops at these stations.
(a) A Class station
(b) B Class station
(c) C Class station
(d) Flag station
Answer:

Option (c)

16.
As per IR height of the platform at station for BG Track
(a) 1.76 m to 1.84 m
(b) 0.76 m to 0.84 m
(c) 0.70 m to 0.80 m
(d) 1.00 m to 2.00 m
Answer:

Option (b)

17.
The yard at which defective wagon or coach is kept
(a) Marsheling yard
(b) Sick line yard
(c) Locomotive yards
(d) Coaching yard
Answer:

Option (b)

18.
In Multiple aspect upper quadrant signal the arm position at 0⁰, 45⁰ and 90⁰ indicates (1) Stop, caution, Proceed (2) Caution, Stop, Proceed (3) Proceed, Caution, Stop (4) All above
(a) 1
(b) 2
(c) 3
(d) 4
Answer:

Option (a)

19.
In color light signal the purpose for Red, Yellow, Double yellow and Green the correct order is
(a) Caution,Stop, Attention and Proceed
(b) Stop, Attention, Caution,and Proceed
(c) Stop, Attention, Proceed and Caution
(d) Stop, Caution, Attention and Proceed
Answer:

Option (d)

20.
It is the LAST STOP SIGNAL at the station
(a) Warner Signal
(b) Starter Signal
(c) Advance Starter signal
(d) Home signal
Answer:

Option (c)

Showing 11 to 20 out of 28 Questions