11.
What are the full form of following indicators? a) ENPV b) ERR
(a) a) Eliminated Net Present Value b) Eliminated Rate of Return
(b) a) Economically Net Present Value b) Effective Rate of Return
(c) a) Estimated Net Present Value b) Estimated Rate of Return
(d) a) Economic Net Present Value b) Economic Rate of Return
Answer:

Option (d)

12.
Which of the following is not a part of Project Management Process Groups?
(a) Initiating Process Group
(b) Budgeting Process Group
(c) Executing Process Group
(d) Closing Process Group
Answer:

Option (b)

13.
Which of the following process is not associated with Project Integration Management area?
(a) Plan Scope Management
(b) Develop Project Management Plan
(c) Direct and Manage Project Work
(d) Monitor and Control Project Work
Answer:

Option (a)

14.
The Indian government had an initial target of ______capacity for 2022.
(a) 20 GW
(b) 18 GW
(c) 17 GW
(d) 16 GW
Answer:

Option (a)

15.
India's geographic location and conducive climate make ___________ energy tremendous successful in India.
(a) wind
(b) hydro
(c) solar
(d) all of above
Answer:

Option (c)

16.
As of 2020, total installed solar power generation capacity of Gujarat is _____MW.
(a) 3,273
(b) 2,273
(c) 1,273
(d) none of the above
Answer:

Option (a)

17.
Sustainable building means that
(a) Green building
(b) Environmental building
(c) Both A and B
(d) None of above
Answer:

Option (c)

18.
Which type of material are use in green building ?
(a) Flay ash and Green Concrete
(b) silica fume and red mud
(c) Marble Dust and Blast furnace slag
(d) all of the above
Answer:

Option (d)

19.
Which criteria are following for housing in smart city ?
(a) Sustainable Architecture & Design , Site Selection and Planning
(b) Water Conservation & Energy efficiency
(c) Both (A) & (B)
(d) none of the above
Answer:

Option (c)

20.
Which of the following process is associated with project time management area?
(a) Define activities
(b) Estimate activities resources
(c) Develop schedule
(d) All of the above
Answer:

Option (d)