41. |
The load-carrying capacity of an under-reamed pile may be determined by _________
|
||||||||
Answer:
Option (a) |
42. |
The under-reamed piles are connected by a beam known as ___________
|
||||||||
Answer:
Option (a) |
43. |
The maximum spacing of the under-reamed pile should not normally exceed __________
|
||||||||
Answer:
Option (b) |
44. |
Under reamed piles are normally bored _________ piles
|
||||||||
Answer:
Option (a) |
45. |
The spacing of the piles in under-reamed pile foundation depends on which of the following factor?
|
||||||||
Answer:
Option (a) |
46. |
The equipment required for construction of a under-reamed pile is________
|
||||||||
Answer:
Option (d) |
47. |
The use of bore guide in under-reamed pile foundation is essential for __________
|
||||||||
Answer:
Option (c) |
48. |
The dimension of the bulb in an under-reamed pile can be checked by __________
|
||||||||
Answer:
Option (b) |
49. |
Pile groups in under-reamed pile foundation can be tested by means of _________
|
||||
Answer:
Option (a) |
50. |
For completion of one under-ream, how many buckets of earth are required for removal
|
||||||||
Answer:
Option (c) |