31. |
As per Tentative Specification for CNS material for replacement of expansive soils: Plastic limit of CNS material is ______%
|
||||||||
Answer:
Option (c) |
32. |
As per Tentative Specification for CNS material for replacement of expansive soils: Plasticity Index of CNS material is ______%
|
||||||||
Answer:
Option (a) |
33. |
As per Tentative Specification for CNS material for replacement of expansive soils: Swelling Pressure of CNS material is ______kg/cm2, when complicated as per Is-2720 part 7
|
||||||||
Answer:
Option (a) |
34. |
As per Tentative Specification for CNS material for replacement of expansive soils: Thickness of CNS material is ______ cm for 1-15 kg/cm2 swelling pressure, when complicated as per Is-2720 part 7
|
||||||||
Answer:
Option (b) |
35. |
As per Tentative Specification for CNS material for replacement of expansive soils: Thickness of CNS material is ______ cm for 2-3 kg/cm2 swelling pressure, when complicated as per Is-2720 part 7
|
||||||||
Answer:
Option (b) |
36. |
As per Tentative Specification for CNS material for replacement of expansive soils: Thickness of CNS material is ______ cm for 3.5-5 kg/cm2 swelling pressure, when complicated as per Is-2720 part 7
|
||||||||
Answer:
Option (a) |
37. |
The standardized length of under reamed pile __________in deep deposited of expansive clay 3.5 m.
|
||||||||
Answer:
Option (a) |
38. |
The standardized diameter of under reamed bulb __________times the shaft diameter.
|
||||||||
Answer:
Option (a) |
39. |
The diameter of shaft of manually bored piles is_________mm
|
||||||||
Answer:
Option (b) |
40. |
vertical spacing between two bulbs in multiple bulb design is__________times bulb diamer up to 30 cm pile diameter.
|
||||||||
Answer:
Option (a) |