Construction Management (2180611) MCQs

MCQs of Construction material management

Showing 21 to 23 out of 23 Questions
21.
Job layout typically represents __________
(a) Construction site plan
(b) Key plan of building
(c) Architecture Plan
(d) Footing Layout
Answer:

Option (a)

22.
A job layout should include __________ feature.
(a) Entry / Exit Point
(b) Storage Area
(c) Site Office
(d) All of the above
Answer:

Option (d)

23.
Which of these factor does not affect job layout?
(a) Nature of Project
(b) Method of Construction
(c) Lead time of Resource
(d) Medical Facilities
Answer:

Option (c)