| 11. |
By adopting value engineering for large construction process upto ________ % of saving can be done.
|
||||||||
|
Answer:
Option (b) |
| 12. |
As per value engineering worth is __________
|
||||||||
|
Answer:
Option (d) |
| 13. |
As per value engineering cost is ________
|
||||||||
|
Answer:
Option (a) |
| 14. |
Value index = ________
|
||||||||
|
Answer:
Option (c) |
| 15. |
Value index can be improved by ________
|
||||||||
|
Answer:
Option (d) |
| 16. |
Relationship of worth and cost can be termed as ________.
|
||||||||
|
Answer:
Option (b) |