11. |
By adopting value engineering for large construction process upto ________ % of saving can be done.
|
||||||||
Answer:
Option (b) |
12. |
As per value engineering worth is __________
|
||||||||
Answer:
Option (d) |
13. |
As per value engineering cost is ________
|
||||||||
Answer:
Option (a) |
14. |
Value index = ________
|
||||||||
Answer:
Option (c) |
15. |
Value index can be improved by ________
|
||||||||
Answer:
Option (d) |
16. |
Relationship of worth and cost can be termed as ________.
|
||||||||
Answer:
Option (b) |