| 1. |
Match following with respect to concern for success by below given stakeholders of project:
1. An Engineer
2. An accountant
3. An Architect
4. A Human Resource manager
A. in terms of employee satisfaction
B. In terms of technical competence
C. In terms of total expenditure
D. In terms of aesthetics
|
||||||||
|
Answer:
Option (b) |
| 2. |
Which of these is not a criteria for project performance evaluation?
|
||||||||
|
Answer:
Option (b) |
| 3. |
Which of these is a criteria for project performance evaluation?
|
||||||||
|
Answer:
Option (d) |
| 4. |
Which of these is not a project success attribute?
|
||||||||
|
Answer:
Option (c) |
| 5. |
Which of these is a project success attribute?
|
||||||||
|
Answer:
Option (d) |
| 6. |
Which of these is not a project failure attribute?
|
||||||||
|
Answer:
Option (d) |
| 7. |
Which of these is a project failure attribute?
|
||||||||
|
Answer:
Option (d) |
| 8. |
Match the right option in terms of effect of element on project performance :
Person Element Affecting Performance
1. McNeil(1986) A. Inter organizational team work
2. Thomas(1998) B. Incentive
3. Chan(2001) C. Effective communication
4. Bower(2002) D. Role of project planning
|
||||||||
|
Answer:
Option (b) |