| 1. |
__________ is the task of project indicators.
|
||||||||
|
Answer:
Option (c) |
| 2. |
__________ does not affect software quality and organizational performance.
|
||||||||
|
Answer:
Option (a) |
| 3. |
The intent of project metrics is __________.
|
||||||||
|
Answer:
Option (d) |
| 4. |
_________ is not a direct measure of Software Engineering process.
|
||||||||
|
Answer:
Option (a) |
| 5. |
__________ is an indirect measure of the product.
|
||||||||
|
Answer:
Option (d) |
| 6. |
Based on which entity the metrics are developed for size oriented metrics?
|
||||||||
|
Answer:
Option (c) |
| 7. |
__________ is not an information domain required for determining function point in functional point analysis (FPA).
|
||||||||
|
Answer:
Option (d) |
| 8. |
Usability is measured in terms of:
|
||||||||
|
Answer:
Option (d) |
| 9. |
Which graphical technique is used to fin if changes and variation in metrics data are meaningful?
|
||||||||
|
Answer:
Option (c) |
| 10. |
Defects removal efficiency (DRE) depends on __________.
|
||||||||
|
Answer:
Option (c) |