Software Engineering (3150711) MCQs

MCQs of Managing Software Project

Showing 1 to 10 out of 71 Questions
1.
__________ is the task of project indicators.
(a) Help in assessment of status of ongoing project
(b) Track potential risk
(c) Help in assessment of status of ongoing project & track potential risk
(d) None of the mentioned
Answer:

Option (c)

2.
__________ does not affect software quality and organizational performance.
(a) Market
(b) Product
(c) Technology
(d) People
Answer:

Option (a)

3.
The intent of project metrics is __________.
(a) minimization of development schedule
(b) for strategic purposes
(c) assessing project quality on ongoing basis
(d) minimization of development schedule and assessing project quality on ongoing basis
Answer:

Option (d)

4.
_________ is not a direct measure of Software Engineering process.
(a) Efficiency
(b) Cost
(c) Effort Applied
(d) All of the mentioned
Answer:

Option (a)

5.
__________ is an indirect measure of the product.
(a) Quality
(b) Complexity
(c) Reliability
(d) All of the Mentioned
Answer:

Option (d)

6.
Based on which entity the metrics are developed for size oriented metrics?
(a) number of Functions
(b) number of user inputs
(c) number of lines of code
(d) amount of memory usage
Answer:

Option (c)

7.
__________ is not an information domain required for determining function point in functional point analysis (FPA).
(a) Number of user Input
(b) Number of user Inquiries
(c) Number of external Interfaces
(d) Number of errors
Answer:

Option (d)

8.
Usability is measured in terms of:
(a) Intellectual skill to learn the system
(b) Time required to become moderately efficient in system usage
(c) Net increase in productivity
(d) All of the mentioned
Answer:

Option (d)

9.
Which graphical technique is used to fin if changes and variation in metrics data are meaningful?
(a) DRE (Defect Removal Efficiency)
(b) Function points analysis
(c) Control Chart
(d) All of the mentioned
Answer:

Option (c)

10.
Defects removal efficiency (DRE) depends on __________.
(a) E – errors found before software delivery
(b) D – defects found after delivery to user
(c) Both E and D
(d) Varies with project
Answer:

Option (c)

Showing 1 to 10 out of 71 Questions