41. |
What all has to be identified as per risk identification?
|
||||||||
Answer:
Option (d) |
42. |
__________ is not a risk management activity.
|
||||||||
Answer:
Option (b) |
43. |
__________ is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss.
|
||||||||
Answer:
Option (a) |
44. |
__________ threatens the quality and timeliness of the software to be produced.
|
||||||||
Answer:
Option (d) |
45. |
__________ threatens the viability of the software to be built.
|
||||||||
Answer:
Option (b) |
46. |
__________ is a systematic attempt to specify threats to the project plan.
|
||||||||
Answer:
Option (d) |
47. |
__________ are associated with the overall size of the software to be built or modified.
|
||||||||
Answer:
Option (c) |
48. |
__________ risks are associated with constraints imposed by management or the marketplace.
|
||||||||
Answer:
Option (a) |
49. |
Risk management is one of the most important jobs for a __________.
|
||||||||
Answer:
Option (d) |
50. |
Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?
|
||||||||
Answer:
Option (c) |