21. |
How many feasibility studies is conducted in Requirement Analysis ?
|
||||||||
Answer:
Option (b) |
22. |
How many phases are there in Requirement Analysis
|
||||||||
Answer:
Option (c) |
23. |
Traceability is not considered in Requirement Analysis.
|
||||
Answer:
Option (b) |
24. |
For the success of project development Requirements analysis is the critical stage
|
||||||||
Answer:
Option (a) |
25. |
Which are the two issues of Requirement Analysis?
|
||||||||
Answer:
Option (b) |
26. |
Is Requirements Analysis is an iterative process?
|
||||
Answer:
Option (a) |
27. |
Requirements should not specify ‘how’ but should only specify ‘what'
|
||||
Answer:
Option (a) |
28. |
__________ does not correspond to a good Software Requirements Specification (SRS)
|
||||||||
Answer:
Option (d) |
29. |
The statement “Conformity to a standard is maintained” depicts _____________ property of SRS.
|
||||||||
Answer:
Option (b) |
30. |
The SRS is said to be consistent if and only if
|
||||||||
Answer:
Option (d) |