Software Engineering (3150711) MCQs

MCQs of Quality Assurance and Management

Showing 21 to 30 out of 33 Questions
21.
Full form of MTBT is ________
(a) Mean Time Between Failures
(b) Mean Time Before Failure
(c) More Time Before Finals
(d) Minutes To Backup Floppies
Answer:

Option (a)

22.
Full form of MTTF is ________
(a) Mean Time To Finance
(b) Mean Time To Failure
(c) Mean Time To Forcestop
(d) Main Trigger Track Finder
Answer:

Option (b)

23.
Full form of MTTR is ________
(a) Mean Time To Restore
(b) Mean Time To Repair
(c) Mean Time To Recovery
(d) Mean Time to Restoration
Answer:

Option (b)

24.
What is Six Sigma?
(a) It is the most widely used strategy for statistical quality assurance
(b) The “Six Sigma” refers to six standard deviations
(c) It is the most widely used strategy for statistical quality assurance AND The “Six Sigma” refers to six standard deviations
(d) A Formal Technical Review(FTR) guideline for quality walkthrough or inspection
Answer:

Option (c)

25.
Which of the following is not a core step of Six Sigma?
(a) Define
(b) Control
(c) Measure
(d) Analyse
Answer:

Option (b)

26.
Six Sigma methodology defines three core steps.
(a) analyze, improve, control
(b) analyze, design, verify
(c) define, measure, analyze
(d) define, measure, control
Answer:

Option (c)

27.
A process must not produce more than ________ defects per million opportunities to achieve Six Sigma.
(a) 690K
(b) 6210
(c) 230
(d) 3.4
Answer:

Option (d)

28.
A process must not produce more than ________ defects per million opportunities to achieve Four Sigma.
(a) 690K
(b) 6210
(c) 230
(d) 3.4
Answer:

Option (b)

29.
A process must not produce more than ________ defects per million opportunities to achieve Five Sigma.
(a) 690K
(b) 6210
(c) 230
(d) 3.4
Answer:

Option (c)

30.
According to ISO 9001, inspection and testing comes under which management responsibility?
(a) Process control
(b) Document control
(c) Control of nonconforming products
(d) Servicing
Answer:

Option (a)

Showing 21 to 30 out of 33 Questions