| 21. |
What is the object of watershed management?
|
||||||||
|
Answer:
Option (d) |
| 22. |
The basic components of watershed cycle are:
|
||||||||
|
Answer:
Option (d) |
| 23. |
The HIA process ensures that heritage buildings are ____________ and that the public is consulted before development.
|
||||||
|
Answer:
Option (a) |
| 24. |
What does HIA stand for?
|
||||||
|
Answer:
Option (b) |
| 25. |
Sustainable building design is an enhanced building ____________ that promotes environmental protection, health and safety.
|
||||||
|
Answer:
Option (a) |
| 26. |
What does LEED stand for?
|
||||||
|
Answer:
Option (b) |
| 27. |
A building which utilizes solar energy such as solar film effectively ______________ heat gain during the winter, and ______________ heat gain during the summer.
|
||||||
|
Answer:
Option (a) |
| 28. |
Green procurement is the use of building materials that are ___________ and ____________ while eliminating the use of materials that contain ozone depleting substances.
|
||||||
|
Answer:
Option (b) |
| 29. |
A waste management plan is a strategy to generate _____________ construction waste on site and to ____________ public fills and landfills.
|
||||||
|
Answer:
Option (b) |
| 30. |
What is a sustainably maintained building?
|
||||||
|
Answer:
Option (b) |