11. |
Core type transformers have, LV and HV windings are arranged such that
|
||||||||
Answer:
Option (a) |
12. |
The shell type transformers have, LV and HV windings are arranged such that
|
||||||||
Answer:
Option (d) |
13. |
Which of the following is not a part of the transformer?
|
||||||||
Answer:
Option (a) |
14. |
Percentage leakage reactance in core type construction, compared to shell type construction of the core, is
|
||||||||
Answer:
Option (c) |
15. |
The ideal shape for the section of the core is
|
||||||||
Answer:
Option (c) |
16. |
If breather of a transformer is blocked
|
||||||||
Answer:
Option (a) |
17. |
Buchholz relay is provided on the transformer to
|
||||||||
Answer:
Option (b) |
18. |
The primary and secondary winding of the transformer are linked to each other by
|
||||||||
Answer:
Option (b) |
19. |
The working principle of the transformer depends upon
|
||||||||
Answer:
Option (d) |
20. |
The primary and secondary windings of an ordinary 2-winding transformer always have
|
||||||||
Answer:
Option (c) |