1. |
The commercial sources of energy are
|
||||||||
Answer:
Option (a) |
2. |
Which is a conventional source of energy ?
|
||||||||
Answer:
Option (b) |
3. |
Which of the following power plants is the most reliable ?
|
||||||||
Answer:
Option (b) |
4. |
Total present power installed capacity in India is more than
|
||||||||
Answer:
Option (d) |
5. |
Capacity of generator and turbine are related as
|
||||||||
Answer:
Option (c) |
6. |
Which of the following is the hydro-electrical power plant ?
|
||||||||
Answer:
Option (a) |
7. |
The power development programmes that are possible in Tamilnadu are largely based on
|
||||||||
Answer:
Option (c) |
8. |
The power output from an hydro-electric power plant depends on
|
||||||||
Answer:
Option (c) |
9. |
If power P available from a hydro-scheme is given by the formula P = 9.81QH, where Q is the flow rate through the turbine in l/s and H is the head in meters, then P will be in units of
|
||||||||
Answer:
Option (a) |
10. |
If the discharge is 1 m3/s and head of the water is 1 m, then the power generated by the alternator in one hour (assume 100% efficiency of generator and turbine) will be
|
||||||||
Answer:
Option (c) |