361.
Load duration curve gives
(a) Variation of load during different hours of the day
(b) Average load
(c) Number of hours for which a particular load lasts during the day
(d) None of above
Answer:

Option (c)

362.
Load duration curve for unity load factor will be of
(a) Rectangular shape
(b) Triangular shape
(c) L shape
(d) I shape
Answer:

Option (a)

363.
Mass curve represents
(a) Average load
(b) Total energy consumed by the load up to a particular time in a day
(c) Number of hours for which a particular load lasts during the day
(d) Variation of load during different hours of the day
Answer:

Option (b)

364.
Mass curve can be plotted from
(a) Load duration curve
(b) Chronological load curve
(c) Energy load curve
(d) Both (a) and (b)
Answer:

Option (b)

365.
Integrated load duration curve representing total number of units generated for a given demand can be plotted directly from
(a) Load curve
(b) Load duration curve
(c) Mass curve
(d) Any of above
Answer:

Option (b)

366.
During which season the load on a power station is maximum
(a) Autumn
(b) Rainy
(c) Summer
(d) Winter
Answer:

Option (d)

367.
Maximum demand on the power system is
(a) Greatest of all short time interval average demand during the period
(b) Instantaneous maximum value of kW supplied during a period
(c) Instantaneous maximum value of kVA applied during the period
(d) Maximum value of units supplied during the period
Answer:

Option (a)

368.
Power system experiences peak demand from
(a) Midnight to 8:00 AM
(b) 8:00 AM to 2:00 PM
(c) 2:00 PM to 6:00 PM
(d) 6:00 PM to 10:00 PM
Answer:

Option (d)

369.
Connected load means
(a) Installed electrical load in the premises of a consumer
(b) Maximum load of a consumer
(c) Load drawn by a consumer at any instant
(d) None of above
Answer:

Option (a)

370.
Maximum demand of a power station is
(a) Sum of maximum demand of all its consumers
(b) Greatest average load in a specific time
(c) Peak value of load in a specific time
(d) All of above
Answer:

Option (b)

Showing 361 to 370 out of 425 Questions