1.
The main aim of the __________ is to check that the machine received is in good condition and are as per our requirements.
(a) inspection
(b) installation
(c) testing
(d) commissioning
Answer:

Option (a)

2.
Inspection is all about
(a) creating a proper foundation
(b) Overall observation (superefficient )
(c) Testing equipment
(d) installation planing
Answer:

Option (b)

3.
What is/are included in the inspection process?
(a) to check received machine is as per requirement (ordered)
(b) to check received machine is in good condition (no damaged)
(c) to check received machine auxiliaries, parts etc are ok or not
(d) All of these
Answer:

Option (d)

4.
After the inspection at the site, you found everything is in good condition. What is/are the reason behind that?
(a) Proper care is taken by the manufacturer
(b) proper packages
(c) Good transportation
(d) All of these
Answer:

Option (d)

5.
maximum damaged to the machinery happen during
(a) inspection
(b) manufacturing
(c) transportation
(d) commissioning
Answer:

Option (c)

6.
When inspection at the site is carried out?
(a) after installation
(b) after commissioning
(c) after un-loading
(d) after testing
Answer:

Option (c)

7.
Which of the following precautions must be observed during handling?
(a) Use hook, don't use shaft or other body parts
(b) Don't lilt the machine, keep it balanced
(c) Don't drag the machine or roll it on the floor
(d) All of these
Answer:

Option (d)

8.
Which of the following are the primary objectives during Un-packing of Machine?
(a) packing must be checked thoroughly
(b) Following the instructions on the packages written by the seller/factory
(c) Report any damage immediately to the seller/factory for the claim.
(d) All of these
Answer:

Option (d)

9.
What will you do if you found a damaged machine during Inspection?
(a) Repair the damage
(b) Report any damage immediately to the seller/factory for the claim.
(c) test the machine that it can rune with the damage
(d) return the machine immediately to the seller/factory
Answer:

Option (b)

10.
Which of the following required during un-packing and inspection?
(a) Machine specification with parts detail and diagram
(b) The planning and availability of handling tool
(c) Skilled worker of handling
(d) All of these
Answer:

Option (d)