41. |
Which precautions must be taken while handling lifting devices?
|
||||||||
Answer:
Option (d) |
42. |
Which precautions must be taken while handling lifting devices?
|
||||||||
Answer:
Option (d) |
43. |
Which of the following tools is/are used for Repairs and Maintenance?
|
||||||||
Answer:
Option (d) |
44. |
Which of the following tools is/are used for Repairs and Maintenance?
|
||||||||
Answer:
Option (d) |
45. |
Which of the following tools is used to remove bearing sets from a rotating machine shaft or from a blind bearing hole.?
|
||||||||
Answer:
Option (b) |
46. |
Which of the following tools is used to measure the clearance between two parts (gap widths)?
|
||||||||
Answer:
Option (a) |
47. |
Which of the following tools is used to measure the deflection of the arm?
|
||||||||
Answer:
Option (c) |
48. |
_________________ is a device consisting of a sealed glass tube partially filled with alcohol or other liquid, containing an air bubble whose position reveals whether a surface is perfectly level
|
||||||||
Answer:
Option (a) |
49. |
Which of the following device is used to check continuity, short circuit and approximate high value of resistant (in MΩ)?
|
||||||||
Answer:
Option (a) |
50. |
The instrument used for measuring the resistance of the earth is known as _________.
|
||||||||
Answer:
Option (b) |