1. |
__________ is the process of assuring that all systems and components of a major piece of equipment, a process, a building or similar are designed, installed and tested according to the operational requirements of the owner or final client.
|
||||||||
Answer:
Option (c) |
2. |
__________ is the process of evaluating a system or its component(s) with the intent to find whether it satisfies the specified requirements or not.
|
||||||||
Answer:
Option (a) |
3. |
_____________ standard specified General Requirements for Type, Routine and Special Tests for transformer.
|
||||||||
Answer:
Option (a) |
4. |
According to IS 2026: Part_1, Transformer tests shall be made at any ambient temperature between __________ °C and with cooling water (if required) at any temperature not exceeding _________ °C.
|
||||||||
Answer:
Option (a) |
5. |
According to IS 2026: Part_1, Transformer tests shall be made at the __________, unless otherwise agreed between the manufacturer and the purchaser.
|
||||||||
Answer:
Option (b) |
6. |
According to IS 2026: Part_1, If required than test results are to be corrected to a reference temperature __________ °C for oil-immersed transformers.
|
||||||||
Answer:
Option (d) |
7. |
According to IS 2026: Part_1, different testes performed are mainly classified into __________ categories.
|
||||||||
Answer:
Option (b) |
8. |
The tests done mainly on a prototype unit (any one unit) out of all manufactured units in a lot (same specification) is known as ___________ Test.
|
||||||||
Answer:
Option (a) |
9. |
The tests done mainly on each and every unit out of all manufactured units in a lot is known as ___________ test.
|
||||||||
Answer:
Option (b) |
10. |
If the tests are done as per _________ requirement to obtain special information useful to the user and specified in the tender is known as Special Test.
|
||||||||
Answer:
Option (a) |