| 21. |
Which of the following maintenance of overhead transmission line is mostly unscheduled?
|
||||||||
|
Answer:
Option (d) |
| 22. |
Which is/are the disadvantages of HVDC Transmission line?
|
||||||||
|
Answer:
Option (d) |
| 23. |
Which is/are the configuration of the HVDC transmission line?
|
||||||||
|
Answer:
Option (d) |
| 24. |
_________ is the first HVDC line in India with _________ MW, approx __________ km,
|
||||||||
|
Answer:
Option (a) |
| 25. |
Type of structure used for LT and 11 kV line
|
||||||||
|
Answer:
Option (d) |
| 26. |
Where wooden poles are used?
|
||||||||
|
Answer:
Option (d) |
| 27. |
Which of the following distribution system poles has less life, strength and voltage level?
|
||||||||
|
Answer:
Option (a) |
| 28. |
Where Steel (Tubular) Poles are used?
|
||||||||
|
Answer:
Option (d) |
| 29. |
The surface of steel poles is galvenised or painted to prevent ______________________
|
||||||||
|
Answer:
Option (a) |
| 30. |
Why Reinforced Concrete (RCC) Poles are more famous?
|
||||||||
|
Answer:
Option (d) |