| 21. |
Why is load shedding done?
|
||||||||
|
Answer:
Option (a) |
| 22. |
Generators for the base loads plants are usually designed for maximum efficiency around
|
||||||||
|
Answer:
Option (a) |
| 23. |
Operating plant factor is
|
||||||||
|
Answer:
Option (a) |
| 24. |
For maximum power transfer to take place between two interconnected stations, angle between voltage of the two should be
|
||||||||
|
Answer:
Option (d) |
| 25. |
Economical loading based on incremental rate gives
|
||||||||
|
Answer:
Option (a) |
| 26. |
By interconnection of stations, the cost is
|
||||||||
|
Answer:
Option (b) |
| 27. |
For stable operation interconnected stations, the element used is
|
||||||||
|
Answer:
Option (b) |
| 28. |
Quadrature boost employed in the interconnected system is used to transfer
|
||||||||
|
Answer:
Option (a) |