21. |
Why is load shedding done?
|
||||||||
Answer:
Option (a) |
22. |
Generators for the base loads plants are usually designed for maximum efficiency around
|
||||||||
Answer:
Option (a) |
23. |
Operating plant factor is
|
||||||||
Answer:
Option (a) |
24. |
For maximum power transfer to take place between two interconnected stations, angle between voltage of the two should be
|
||||||||
Answer:
Option (d) |
25. |
Economical loading based on incremental rate gives
|
||||||||
Answer:
Option (a) |
26. |
By interconnection of stations, the cost is
|
||||||||
Answer:
Option (b) |
27. |
For stable operation interconnected stations, the element used is
|
||||||||
Answer:
Option (b) |
28. |
Quadrature boost employed in the interconnected system is used to transfer
|
||||||||
Answer:
Option (a) |