| 21. |
Which of the following is the short term stability in a load driven system?
|
||||||||
|
Answer:
Option (b) |
| 22. |
Which of the following is the long term stability in a Load driven system?
|
||||||||
|
Answer:
Option (d) |
| 23. |
The time scale of transient voltage stability due to static VAR compensator is
|
||||||||
|
Answer:
Option (a) |
| 24. |
The time scale of transient voltage stability due to OLTC operation is
|
||||||||
|
Answer:
Option (b) |
| 25. |
The expression of critical receiving end voltage is
|
||||||||
|
Answer:
Option (c) |
| 26. |
The expression for critical power angle is
|
||||||||
|
Answer:
Option (a) |
| 27. |
Which of the following methods is/are used for reactive or voltage compensation
|
||||||||
|
Answer:
Option (d) |
| 28. |
The operation of OLTC does
|
||||||||
|
Answer:
Option (b) |
| 29. |
The operation of OLTC improve voltage stability if
|
||||||||
|
Answer:
Option (a) |
| 30. |
Line compensation improve power system operation by
|
||||||||
|
Answer:
Option (d) |