| 1. |
Load forecasting is a method
|
||||||||
|
Answer:
Option (a) |
| 2. |
The load curve describe
|
||||||||
|
Answer:
Option (b) |
| 3. |
Daily load curve divided into how many parts
|
||||||||
|
Answer:
Option (b) |
| 4. |
Load forecasting is nothing but to estimate
|
||||||||
|
Answer:
Option (c) |
| 5. |
In Load forecasting, The present and lead time is represented by
|
||||||||
|
Answer:
Option (a) |
| 6. |
Load forecasting method are
|
||||||||
|
Answer:
Option (d) |
| 7. |
The extrapolation method is based on the
|
||||||||
|
Answer:
Option (d) |
| 8. |
Extrapolation method is also known as
|
||||||||
|
Answer:
Option (b) |
| 9. |
Match standard analytical with its equation
i. Straight line A.α+βσ+γσ2+η3
ii. Parabolic B.α+βσ+γσ2
iii. S-curve C. α+βσ
iv. exponential D.γΕσ
v. Gempertz E. ln-1
|
||||||||
|
Answer:
Option (b) |
| 10. |
Which of the following method is generally adapted for curve fitting
|
||||||||
|
Answer:
Option (c) |