31. |
The first step in preparing an MPS is:
|
||||||||
Answer:
Option (a) |
32. |
Just-in-Time was successfully implemented by
|
||||||||
Answer:
Option (a) |
33. |
In the Just-In-Time system
|
||||||||
Answer:
Option (c) |
34. |
POK stands for
|
||||||||
Answer:
Option (c) |
35. |
In Just-In-Time, the vendor is to be viewed by the company as a
|
||||||||
Answer:
Option (c) |
36. |
Just-In-Time is
|
||||||||
Answer:
Option (a) |
37. |
MRP is different from JIT in terms of
|
||||||||
Answer:
Option (d) |
38. |
The following is (are) the prerequisite(s) for JIT.
|
||||||||
Answer:
Option (d) |
39. |
Just-In-Time aimed at
|
||||||||
Answer:
Option (a) |
40. |
Just-In-Time (JIT) combines the benefits of
|
||||||||
Answer:
Option (a) |