21. |
CRP takes material requirements from MRP and converts to
|
||||||||
Answer:
Option (d) |
22. |
Capacity planning is concerned with
|
||||||||
Answer:
Option (c) |
23. |
CRP stands for:
|
||||||||
Answer:
Option (c) |
24. |
MRP II stands for:
|
||||||||
Answer:
Option (c) |
25. |
MRP-II system is called a closed-loop system because it considers
|
||||||||
Answer:
Option (b) |
26. |
Purchasing and ___________ represent the implementation and control phase of the production planning and control system.
|
||||||||
Answer:
Option (d) |
27. |
The MRP forms a vital link between sales and production as follows:
|
||||||||
Answer:
Option (d) |
28. |
PAC stands for:
|
||||||||
Answer:
Option (b) |
29. |
The MRP forms a vital link between sales and production as follows:
|
||||||||
Answer:
Option (d) |
30. |
The objectives in developing an MRP include:
|
||||||||
Answer:
Option (d) |