1. |
Which of the following is not a part of Five M’s?
|
||||||||
Answer:
Option (c) |
2. |
The correct sequence of operations in production planning and control is:
|
||||||||
Answer:
Option (a) |
3. |
Which of the following is true for ‘Routing’?
|
||||||||
Answer:
Option (d) |
4. |
Loading may be defined as:
|
||||||||
Answer:
Option (c) |
5. |
Dispatching authorizes the start of production operations by
Which of the following is (are) true?
|
||||||||
Answer:
Option (d) |
6. |
The bill of material does not consist of
|
||||||||
Answer:
Option (d) |
7. |
The transit time consist of
|
||||||||
Answer:
Option (b) |
8. |
The master schedule is prepared for
|
||||||||
Answer:
Option (c) |
9. |
Centralized and decentralized are the types of______.
|
||||||||
Answer:
Option (b) |
10. |
Predicting future sales activity is known as______.
|
||||||||
Answer:
Option (c) |